Project PlanCo V1.43 preview

Project PlanCo V1.43

Mods by Channel5 Gaming Planet Coaster Rank #47,728 in Planet Coaster updated 3 years ago
park sandbox
View on Steam Workshop

About Project PlanCo V1.43

What the creator says, alongside confirmed listing details.

Project PlanCo V1.43 is a community item for Planet Coaster listed on Steam Workshop.

A usable creator description is not available in the catalogue. Check the original listing for features, requirements, and installation notes.

Mod details

Creator
Channel5 Gaming
Category
Unclassified
Published
May 4, 2023
Last Workshop update
May 4, 2023
Workshop item
#2971425182
Details from the Steam Workshop listing View source ↗

1 image from the mod listing

Timeline

Key dates from the original listing and ModOrNot's catalogue.

  1. First published

    The item was first published on Steam Workshop. Steam listing ↗

  2. File last updated

    Latest file-change date reported by Steam Workshop. Steam listing ↗

Subscribers
114
114 total
Favorites
2
Views
281
Rank in game
#47,728
Planet Coaster
New subscribers · 7d
—
114 total
New subscribers · 30d
—
Growth · 7d
—
ModOrNot Score
—
0–100 momentum

Why it ranks here

Project PlanCo V1.43 currently has 114 subscribers. Recent growth metrics are unavailable; the last calculation was 44d ago.

Metrics from 7 stored snapshots. How ModOrNot ranks mods →

Subscriber change since tracked

View change since tracked

Favorite change since tracked

Platform availability

PC Available

Steam Workshop item — PC/Steam distribution.

Official source ↗

PlayStation 5 Not verified
Xbox Series X|S Not verified

Availability is only claimed when an official source proves it. A platform we cannot verify is shown as “Not verified” — we never assume a PC Workshop mod runs on a console.

More Planet Coaster mods

Mod Subscribers 7d Score
211 +5 91.5
375 +13 90.2
332 +142 90.0
722 +116 90.0
341 +150 90.0

Frequently asked questions

How popular is Project PlanCo V1.43 compared with other Planet Coaster mods?

It ranks #47,728 among 174,503 tracked active Planet Coaster mods by subscribers — within the top 27.35%. This is a subscriber-based position, not a quality verdict. Counts and placement can change as the catalogue updates.

Is Project PlanCo V1.43 available on PC?

The official Steam Workshop listing establishes PC distribution for Planet Coaster. This does not verify current downloadability or compatibility with every PC configuration. Official source ↗

When was the mod last updated?

The source listing reports May 4, 2023 as the last file update. A later comment or catalogue refresh does not mean the mod file changed. Official source ↗

What does the ModOrNot Score mean on this page?

It is a 0–100 momentum signal: 50% subscriber-growth velocity relative to mods in the same game, 20% favorite growth, 20% view growth, and 10% update recency. It is not a quality rating. A recent score is unavailable for this mod, so no estimated value is shown.

Are these the real Steam Workshop numbers?

ModOrNot stores public Steam Workshop counts from its collection runs. The totals shown here are the latest counts stored in our catalogue; changes over time are calculated from recorded observations, not invented values. They can differ from the live listing until the next collection.

How is the rank computed?

ModOrNot compares tracked active Planet Coaster mods by their current stored subscriber totals. Rank #1 has the most subscribers; equal totals share a rank. The rank is calculated when this page loads and can change as counts or the catalogue change.